Stelo Technology

ERP Load Testing for a Logistics Company: Stable at Peak Loads

load testing

A logistics company’s ERP system showed strain at peak operational periods, causing slow responses and delays. Stelo ran load testing, stress testing and performance benchmarking to find bottlenecks. The ERP handled peak loads better, with improved response times and reduced downtime.

Project at a glance

  • Client: Logistics company running an ERP system integrated with other operational tools
  • Service: Load, stress and performance testing
  • Tools: Load simulation and monitoring tools (CPU, memory and response-time tracking)
  • Headline result: Better peak-load handling, faster response times and less downtime

Before and after

Before SteloWith Stelo
Slow responses and delays at peak periodsImproved transaction processing speed and response times
Unclear where bottlenecks wereBottlenecks identified from monitored CPU, memory and response-time data
Operations at risk during high demandOperational continuity during high-demand periods

The challenge

The ERP system was highly integrated with other operational tools, so isolating performance problems was hard. Simulating realistic peak loads, such as end-of-month inventory reconciliation or high-volume order processing, meant handling large volumes of test data. Changes also had to be coordinated across departments to avoid disrupting daily work.

What we did

  • Defined performance benchmarks and thresholds, including response times and concurrent user capacity.
  • Simulated real-world peak loads with load, stress and benchmarking tests.
  • Monitored CPU, memory and response times during the tests and analysed deviations to pinpoint bottlenecks.
  • Raised loads gradually instead of all at once, which kept the system stable while changes were made.
  • Supported system configuration changes, including hardware upgrades and software optimisations, and held regular stakeholder meetings to align departments.

Results

  • The ERP handled peak loads better, with stronger stress handling and reduced downtime.
  • Transaction processing speed and response times improved.
  • Operations continued during high-demand periods, increasing customer satisfaction and reducing operational risk.

Facing similar challenges?

Need to know how your ERP behaves at peak? Start a 2-week free trial or see our performance testing services.

Related case studies: Ajman fintech performance testing, Healthcare ERP regression automation. See all Stelo case studies.

Subscribe to our Newsletter

Ready for Free Consultation ?

Book a call with Experts